• Okada Manila Okada Manila
  

• Savills - Casino Resort

• Senior Project Manager

Okada Manila is a $2.5 billion integrated entertainment resort "Manila Bay Resorts", owned by Japanese casino operator Kazuo Okada and was partially opened as scheduled on 20/12/2016.

Phase one features a casino with:
Large mass gaming, Two hotel towers, 1000+ keys, Night clubs, A wide variety of dining options, A spectacular fountain with integrated fire and laser show.
• GEG Galaxy, Macau
  
  Corporate Design Development

• Client Side - Casino Resort

• Senior Project Manager

Galaxy Macau Phase 2 Tower opened in May 2015 & is one of Asia’s largest Entertainment & Casino projects built in Cotai Macau by the "Galaxy Entertainment Group".

Phase 1 Galaxy Macau opened in May 2011 & is a HK$ 16.5 billion resort with a total area of 555,000 meters & finest Asian hospitality.

Project Deliver on time and to all expectations of the 5+ Star brand of "Galaxy Macau".

• The Ritz Carlton, Macau
  
  Ritz Carlton Sky Levels

• Client Side - New Build

• Senior Project Manager

Project Manage all disciplines/consultants. "The Club Lounge", "The Sky Lobby & Bar" & "The Sky Villas" consists of the most prestigious spaces on the top floors for the operators most exclusive cliental. Ensuring & validating design intent & brand standards in all design from HBA. Value engineer to facilitate best possible result in quality, time & value.

Project delivered ahead of time to the 5+Star Brand of "The Ritz Carlton".

• SF99 Sigma Super Yacht, Germany

• 118 Meter Yacht Fit out

• Greenline Interiors, Dubai

• Interior Design Manager

Interior Fit-out including 6 luxury guest cabins, the owners suite, the captains suite & the aft deck of 118 meter super yacht "Sigma" designed by the renown French designer "Philippe Starck" Project Manage production of mock-ups & prototypes, coordination of designs into detailed production drawings working with the Starck Network, the Clients Rep, the shipyard Blohm & Voss in Germany & the production division at Greenline.

Sigma was delivered to the client in 2007 and renamed "A".

• Sheraton Hotel Towers, Dubai
  

• Client Side - Refurbishment

• Project Manager - Design

Project Manage ID WA International with Starwood Hotels & Resorts for all design phases. Approve all shop drawings & mock ups. Manage the complete execution of renovation to include 284 rooms, 3 F&B outlets, reception, main lobby & banqueting.

Refurbishment executed in 3 phases over a nine month period with the hotel remaining open.

• Crowne Plaza, IMPZ, Dubai
  

• Client Side - New Build

• Interior Design Manager

Manage ID with Intercontinental Hotel Group from beginning to end of all design phases. Source manufacturers aboard for FF&E & joinery. Approve all mock-ups, prototypes & shop drawing submittals.

Factory Inspections - Approve all millwork, stone, loose furniture, specialized finishes, bespoke joinery, art works

• Holiday Inn, Downtown, Dubai
   Client Side - Refurbish

• Holiday Inn, Embassy, Dubai
   Client Side - New Build

• Project Manager - Design

Soft refurbishment of Guest Rooms, Suites, Main Lobby, F&B Manage ID Studio with IHG for all the design phases.

Source manufacturers aboard for FF&E & joinery. Approve all mock-ups, prototypes & shop drawing submittals.

Factory Inspections -Approve millwork, stone, loose furniture, special finishes, bespoke joinery, art works

• Caltex New Zealand

• Supper Snack Outlets

• Project Design Engineer

Design and development on Caltex Service Station convenience store, "Super Snack". Development and Programming of propriety CAD design system with "Super Snack" 3D library database

Nation wide Roll out of "Super Snack" convenience store to participating Caltex Service Station operators
• Fairmont on the Palm, Dubai
  

• Interior Design Manager

Design & execution of two new F&B outlets. Redesign of parts of main lobby and guest circulation areas, lift lobbies as per request from operator after soft opening.

Approved all shop drawings and mock ups.

• Park Road Post Productions

• The Lord of the Rings Trilogy

• Film Set Design Manager

Design & Project Management of various movie sets for Peter Jackson's production of the Lord of the Rings trilogy. Miniatures Scale model building for King Kong film. Interior design for Peter Jackson’s latest film & audio postproduction studio.

Park Road Post Productions in Miramar is a state of the art editing suite for the film industry in NZ & abroad

• Westfield New Zealand
• Wellington Queensgate Plaza

• Client Side - Refurbishment

• Interior Design Manager

Conversion of existing mall into the Westfield Brand. Project Manage production of a 3D model of the entire new mall. Enhanced the same producing 5+ minutes of high quality rendered animation with a fly through of all areas.

This provided the most effective valuable tool for leasing of retail space in the mall.

• Grand Excelsior Hotel, Dubai
  

• Client Side - New Build

• Project Manager - Design

Manage McNally Design International from beginning to end of all design phases. Source manufacturers aboard for all FF&E & joinery. Approve all Mock-ups & shop drawing submittals. Project Manage the complete execution / installation of all interior works at site.

Manage pre opening team, commission hotel for soft opening.

• DXB Terminal 3, Dubai

• Project Manager - Design

Design & execution of Vaga Travel in Departure Terminal 3, Dubai

Design & execution of Tavelx Currency exchange centre.

• Ramada Hotel, Deira, Dubai
  
• Star Metro Hotel, Dubai
  
• Project Manager - Design
Execution of new Lounge Bar in main lobby


Design & execution of Lobby Coffee shop
Design & execution of new All Day Dinning

• Converse Outlets, Dubai

• Project Manager - Design

Design & execution of store - Mall of Emirates, Dubai

Design & execution of store - Dubai Outlet Mall

• Baskin Robbins Outlets, Dubai

• Project Manager - Design

Design & execution of BR outlet in SIT Tower, Silicon Oasis, Dubai

Design & execution of BR outlet in Souq Extra, Business Bay, Dubai

• Dhow Palace Hotel, Dubai
  

• Client Side - New Build

• Interior Design Manager

Approve all mock-ups, prototypes & shop drawing submittals. Factory Inspections - Approve all millwork, stone, loose furniture.

Manage & oversee the team for installation of complete interior works at site.
Manage pre opening team, Commission the hotel for soft opening. Lux Interiors.